A kitchen is the most heavily sequenced room in a house. The work is not difficult so much as unforgiving about order — which is why we draw it, schedule it and order the long lead items before anything comes off the wall.

Fifteen or so separate trades and deliveries have to reach a kitchen in a specific order, and almost every one of them is blocked by the one before it. Cabinets cannot be set until the floor is flat and the walls are patched. Counters cannot be templated until the cabinets are set and levelled. The backsplash cannot go on until the counters are in. The plumber cannot make the final connections until the counter has a sink cut in it. Get the order wrong once and you are not a day behind, you are three weeks behind, because everybody has moved on to another job by the time you need them again.

That is the real work of running a kitchen remodel, and it is why the schedule is written down before demolition rather than assembled week to week. We identify the long-lead items first, because they set the calendar: cabinetry is commonly eight to fourteen weeks from approved drawings, and a single back-ordered appliance can hold up the counter template.

What you get, practically, is a kitchen that is out of service for a defined stretch rather than an indefinite one, and a project where the answer to “what is happening next week” was written down in advance.

Kitchen Remodeling · scope

  • Layout study and clearance check against the existing plumbing wall
  • Cabinetry ordered from site-verified dimensions, not plan dimensions
  • Counter template taken after cabinets are set and levelled
  • Electrical brought to current circuit and receptacle requirements
  • Ventilation ducted to the exterior with a make-up air path considered

Every item above appears as a line in your written scope of work with the specific materials named. This list is the shape of the document, not a substitute for it.

B 2.0

Layout: what the plumbing wall will and will not allow

Almost every kitchen conversation starts with moving the sink, opening a wall, or adding an island. All three are usually possible. What differs enormously is what they cost, and the cost is under the floor rather than in the fixture.

A sink that moves needs new drain and vent runs that hold the correct slope over their whole length. Over a crawl space that is a straightforward morning. Over a post-tension or conventional slab it means cutting and patching concrete, and the drain has to be routed somewhere it can actually fall. A gas range that moves needs a new gas run and a ventilation path that reaches the exterior, which on an interior wall can mean a soffit or a longer duct run than the hood is rated for.

So we look before we draw. During the consultation we check what is accessible from the crawl space or the attic, which direction the joists run, where the existing vent stack is, and whether the wall you want to remove is carrying anything. In the 1970s and 1980s tract housing common across Vacaville and Fairfield, the wall between the kitchen and the family room is load-bearing far more often than homeowners expect. Where it is, an engineer sizes the beam and the posts, and the calculations go into the permit set.

Then clearances get checked against real dimensions rather than assumed ones: the walkway between a run and an island, the door swing on a refrigerator that is deeper than the one it replaces, and the drawer that would otherwise collide with the corner cabinet.

B 3.0

Cabinetry, counters, and the measurements that count

Cabinets are ordered from dimensions taken at the framed opening after demolition, not from dimensions on a plan. Plans are drawn from a survey of a finished room; the framing behind that finish is rarely where the drawing suggests, and a cabinet run that is a half-inch too long for its wall is a problem you cannot solve on site with a caulk gun.

Counters are templated after the cabinets are installed, fastened and levelled. This is the one part of the schedule people are most surprised by, so it is worth stating plainly: there is normally a gap of one to two weeks between cabinet installation and counter installation, and during that gap the kitchen has a temporary plywood surface and no sink. We plan that window with you rather than announcing it.

Where your existing boxes are sound, well built and in the right places, new doors, drawer fronts, hardware and interior fittings are a legitimate scope, and a faster one, because nothing waits on a long lead time. We will tell you honestly which boxes are worth keeping. Particleboard carcases with sagging shelves and stapled joints generally are not. Full details of built-in work are on the custom cabinetry page.

B 4.0

Electrical, ventilation and the things inspectors look at

A kitchen alteration that pulls a permit brings the electrical work in that kitchen up to current requirements: dedicated circuits for the appliances that need them, receptacle spacing along the counter runs, ground-fault protection at the counter, and arc-fault protection where it applies. If the existing panel does not have the capacity for what is being added, that is a finding for the design stage and a line in the estimate, not a discovery in week five.

Ventilation is the item most often specified badly. A hood has to be sized for the range beneath it and ducted to the exterior through a run it can actually move air along; ducting into an attic is not a termination. Where a powerful hood is specified in a tight house, the make-up air path has to be considered so the hood is not fighting the building.

Under-cabinet lighting, the fixture layout over an island, and switching that makes sense when you walk in with your hands full are all decided on the plan, in the same pass as the outlets, because moving a box after the drywall is closed means opening the drywall again.

Everything above is quality of execution rather than decoration, and none of it is visible when the job is finished. It is, however, the part you are actually buying, and it is the part a written scope of work lets you compare between one bid and another. Our full sequence, measure by measure, is on the process page.

Questions

Asked about kitchen remodeling

Broader questions about permits, payment stages and living on site are answered on the questions page.

Can the sink or range move to a different wall?

Usually, but the cost sits in what is under the floor rather than in the fixture. Moving a sink means new drain and vent runs that have to hold the right slope, which is straightforward over a crawl space and considerably more involved over a slab. Moving a gas range means a new gas run and a ventilation path to the exterior. We check what is accessible during the consultation and tell you which walls are straightforward to plumb and which are not, before you fall in love with a layout.

When are the counters templated?

After the cabinets are set, levelled and fastened — never from drawings. A template taken from installed cabinets is the only one that accounts for walls that are out of plumb, which every wall is. This is why there is a gap of one to two weeks between cabinet installation and counter installation on nearly every kitchen, and why a temporary plywood surface is worth planning for.

Do I have to replace the cabinets to change the kitchen?

No. If the boxes are sound, well built and in the right places, refacing or new doors and drawer fronts with new hardware and interior fittings is a legitimate scope, and it moves faster because nothing needs to be ordered nine weeks out. We will tell you honestly which of your existing boxes are worth keeping. Particleboard boxes with sagging shelves and stapled joints are usually not.

Where we do this work

Kitchen Remodeling is carried out by Blue Mountain Construction Services Inc throughout Vacaville, Fairfield, Suisun City, Dixon, Davis, Napa, Solano County, CA. Our office is at 707 Aldridge Road, Suite B, Vacaville, CA 95688, which is why Vacaville projects have the most scheduling flexibility — and why we know which departments review what in the towns around it.

Permit requirements, plan-check turnaround and inspection scheduling all differ between a Vacaville project, a Solano County unincorporated parcel, and a job in Davis or Napa. We tell you which set of rules applies to your address at the consultation rather than after the drawings are done. See the full service area.

Contractor Sheet ref. NAICS 236118

Blue Mountain Construction Services Inc

707 Aldridge Road, Suite B Vacaville, CA 95688
Phone
(800) 889-2085
Email
info@sillee.com
Hours
Mon–Fri 08:00–17:00 America/Los_Angeles
Trade
Residential Remodelers

Talk to our team about your kitchen remodeling

Describe the rooms and the changes you are considering. We will come out, take our own measurements, and put a written scope of work in front of you before anything is priced.

Blue Mountain Construction Services Inc · 707 Aldridge Road, Suite B, Vacaville, CA 95688

Request an estimate Call (800) 889-2085

Mon–Fri 08:00–17:00, America/Los_Angeles